Where am I?
Floor Specifications
BHS is dedicated to customer service before, during, and after the sale. In keeping with this commitment, BHS offers floor inspections on all man-on-board battery extractor environments prior to installation to address any issues limiting the productivity of your battery extractor system.
Defined Traffic Floor Requirements for Battery Extractor Travel Path
| American Concrete Institute 117 (ACI 360) | UK Concrete Society Technical Report 34 (TR34) | |
|---|---|---|
| Machine Type | Fmin | |
| SL, DS | 40 | CAT 2 |
| TS | 60 | CAT 1 |
| QS | 85 | SUPERFLAT |
The above are minimum requirements to ensure satisfactory operation.
Note: Contact factory if seismic certification is needed.

